Tuesday, September 10, 2013

Sept 4 Update on ATT


The missing link is about to be completed. Here is the unfinished trail as it leads up to the new I-40 crossover bridge. The bridge's superstructure was put in place in July. Just 2 weeks ago the concrete deck was poured. There are a few finishing touches to be done but it will be ready for the official grand opening Oct 12.

Not many rail trails can boast a $7.5 million bridge. This one is 268 feet long spanning I-40 just south of Durham NC. The main support structure are two 30 in diameter arched pipes. All material were sourced in the US for a change. Once completed the 14.5 mile southern section will be connected to downtown Durham with the 7 mile northern section


New approach trail hugs the property border of Southpointe Mall. It is one of the only places I can ride a bicycle over the posted speed limit. The new trail sections will allow us to use the mall for a parking area and provide an array of restaurants for post ride meals.


Great Blue Herons are often seen in the wet area less than 1/2 mile from the southern terminus. Beaver Creek is impounded here to provide habitat for waterfowl and water birds.

No comments:

May 19 Watkins Glen

  One of the top 10 state parks in the US, Watkins Glen sits right beside the town of the same name, the race track of the same name and at ...